By John — Desalination News

Energy Recovery Inc. is building its first manufacturing facility outside the United States in Saudi Arabia, a move the California-based maker of desalination energy-recovery equipment says reflects how central the Kingdom has become to its business as Gulf utilities keep expanding seawater reverse osmosis (SWRO) capacity.

The company has signed a lease for a 3,750-square-meter site near Dammam Second Industrial City, to be operated through Energy Recovery Company, a newly registered Saudi entity wholly owned by the US parent. The Dammam facility will handle machining, assembly and testing for Energy Recovery’s PX Pressure Exchanger line, the core component the company sells to desalination plant operators to cut electricity use by recovering pressure energy from the concentrated brine a reverse osmosis plant would otherwise discharge as waste. Ceramic components for the devices will continue to be manufactured at Energy Recovery’s existing plant in San Leandro, California, and shipped to Dammam for finishing, assembly and testing closer to the company’s biggest Gulf customers, rather than shipping complete units from the United States. The company expects the facility to be operational in 2027, with full-scale production targeted for the first half of 2028.

Saudi Arabia draws more than 70% of its potable water from desalination, making it one of the most desalination-reliant countries in the world and a market every major equipment supplier is racing to serve more directly. The Saudi Water Authority has pegged the combined Saudi and wider Middle East and North Africa market opportunity for the kind of pressure-exchanger technology Energy Recovery makes at roughly 547 million riyals, or about $146 million, split by the authority into roughly 247 million riyals within Saudi Arabia itself and 300 million riyals across the rest of the region. The authority has also said it expects the Dammam project to contribute about 137 million riyals, or roughly $36.5 million, to Saudi GDP by 2033, framing the investment as part of the Kingdom’s broader push to localize the manufacturing of equipment that goes into its desalination plants rather than importing it. Eng. Mohammed Alshaikh, the Saudi Water Authority’s vice president of strategic partnerships and local content, welcomed the investment as a contribution to that long-term localization ambition, while Energy Recovery’s interim president and chief executive, Alex Buehler, described the new site as a complement to the company’s existing California operations rather than a replacement for them.

The facility arrives as Saudi Arabia’s own desalination capacity keeps climbing, with the Kingdom’s total output projected to rise from around 16 million cubic meters a day in 2025 to roughly 19 million cubic meters a day by 2031 as new independent water plants come online along the Red Sea and Gulf coasts. Energy Recovery is already supplying its newest PX Q650 devices to one of those projects, a plant the company has said will rank among the ten largest desalination facilities in the world once complete, and the Dammam factory is intended to let the company service contracts like that one, and the broader pipeline building behind it, without relying entirely on exports from the United States.

For plant operators, the appeal of localizing equipment supply mirrors the appeal of the pressure exchangers themselves: anything that trims cost or delay across a desalination plant’s multi-decade operating life compounds into real savings, whether that comes from lower electricity bills or from equipment that can be serviced and replaced locally rather than waiting on shipments from overseas. Saudi Arabia’s Vision 2030 economic diversification program has made that kind of local content a recurring condition attached to major infrastructure contracts, and Energy Recovery’s Dammam facility is one of a growing list of foreign desalination-technology suppliers establishing a physical footprint in the Kingdom rather than simply selling into it. Whether the 2027 timeline holds, and how quickly the plant ramps toward the full-scale production Energy Recovery is targeting for 2028, will likely become clearer as the company reports on the facility’s progress in its coming quarterly results.

(Source: Energy Recovery, Arab News, Saudi Water Authority)

By John